Deposits, contracts and warranties: what to sign and what to refuse

A modest deposit, payments you can photograph, a legal name on the page and a warranty you can read.

Deposit
Modest; a larger one comes with dates in writing
Payments
Tied to photographed stages
Contract over $2,500
Lien-law notice
Job over $5,000
Notice of Commencement; lien releases

What should a deposit and a contract look like for hardscape in Florida?

A deposit that's a fraction of the price, a payment schedule tied to stages you can see (demolition done, base inspected, pour or laying complete, final), and a contract that names the legal entity, the scope with quantities and spec, price, start and completion windows, warranty terms and the lien-law notice Florida requires over $2,500. If the deposit is big enough to buy materials, the contract should also say when the permit will be applied for and when work starts.

A company that wants half up front for flatwork, won't put the payment schedule in writing, or won't name the entity is telling you how the job will go.

The contract checklist

  1. Legal name of the company, matching its Sunbiz record, and a certificate of insurance sent by the agent.
  2. Scope: square footage, thickness or paver system, base depth and material, reinforcement, joints, drainage, demolition, disposal.
  3. Materials by manufacturer, product and color.
  4. Permit and ARC responsibility and who pays fees.
  5. Price, deposit, progress payments tied to stages, final payment on completion.
  6. Start window and completion window, with the weather clause stated plainly.
  7. Warranty: what's covered, for how long, how to claim.
  8. Lien-law notice (over $2,500); Notice of Commencement and lien releases (over $5,000).
  9. Change-order process in writing.

Common questions

How much deposit is normal for a concrete or paver job in Florida and what should the contract say?

For residential work, a modest deposit (often 10 to 30 percent) with the balance in progress payments tied to stages is normal, and a deposit large enough to buy materials should come with a permit application date and a start date written into the contract. The contract states the legal name, scope, price, payment schedule, start and completion windows, warranty and the lien-law notice.

What should a written warranty cover for pavers and concrete?

Workmanship: base failure, joints cut late, scaling from a bad finish, settled pavers, edge restraint failure, joint sand loss in the first season. Excluded, normally: hairline shrinkage cracks, color variation, damage from vehicles over the design load, tree roots, storm surge, efflorescence, stains from irrigation or salt. Manufacturer warranties on pavers and sealers are separate documents.

What is the lien-law notice?

Florida's construction lien law requires a notice in contracts over $2,500 explaining that suppliers and the other trades on the job can lien your property if the company you hired doesn't pay them; a Notice of Commencement recorded for jobs over $5,000 and releases of lien with each payment protect you.

Last reviewed September 10, 2026 by Luciano, Owner.